An eight-bay ultra-rapid EV hub has permission at Hounslow East station, with work due in 2027. Hatton Cross is already open and Hanger Lane follows in spring.
An ultra-rapid charging hub for electric vehicles with eight bays has planning permission in the car park of Hounslow East Underground station, a Piccadilly line stop in the neighbouring borough of Hounslow. Construction is due to start in 2027, Transport for London (TfL) says.
The hub is one of at least five that Fastned, a charging operator, and Places for London, TfL’s property company, plan to start building next year. Their first hub, at Hatton Cross near Heathrow, opened in April 2026, and a second opened this month at East Finchley station.
Overview
- Coming: an 8-bay hub in the Hounslow East station car park, with construction due to start in 2027.
- Open now: Hatton Cross, near Heathrow Airport, since April 2026, and East Finchley station car park on High Road since this month.
- Speed: 400kW chargers that can add up to 100 miles of range in five minutes to a compatible vehicle, TfL says.
- Next spring: a 36-bay hub at Hanger Lane in Ealing, due to open in spring 2027.
- By 2030: the partners aim for up to 25 sites across London.
Why it matters for drivers without a driveway
Richmond upon Thames is an outer London borough. TfL’s Travel Demand Survey found that 64 per cent of outer London households, and 93 per cent in inner London, have no private off-street parking. Those are the drivers the venture says its hubs are meant to serve, along with commuters, taxis, private hire vehicles and commercial fleets. TfL is also consulting on rules that would require new minicabs to be electric from 2028.
Seb Dance, Deputy Mayor for Environment and Energy, said: “To tackle the climate crisis, clean up our air, and build a net-zero city, we must make switching to electric vehicles seamless for every Londoner. The Mayor’s goal is for London to have 40,000 EV chargers by 2030 and the incredible momentum achieved by Fastned and Places for London proves what can be achieved when bold ambition meets rapid delivery.
“From Hatton Cross to East Finchley, and with monumental sites like Hanger Lane coming soon, this roll-out is vital for the thousands of drivers who don’t have access to a driveway.”
The hubs already open
TfL says the Hatton Cross hub supported more than 1.1 million zero-emission kilometres in its first six months, which it puts at 28 laps of the Earth.
The East Finchley hub, in the Northern line station car park, has eight bays and took eight months from planning consent to opening. It is the first of the venture’s sites with Fastned’s yellow solar wings.

All the venture’s sites run on 100 per cent renewable energy and use 400kW chargers, according to the release. They have extra-wide bays, clear sightlines and lighting, 24/7 multilingual support and fully accessible spaces in line with British Standards Institution guidance.
Tom Hurst, UK Country Director at Fastned, said: “We are building real momentum across London. In less than a year, we’ve proven that well-designed, ultra-rapid charging changes the game for drivers. With Hatton Cross answering a critical local demand, East Finchley now welcoming drivers, and our game-changing 36-bay Hanger Lane flagship taking shape, we’re showing what the future of urban charging looks like.
“Securing planning for key sites in Barking and Dagenham, Hillingdon and Redbridge gives us the springboard to accelerate even faster. Drivers want fast, reliable, safe charging that fits naturally into their day.”
The sites due to start in 2027
The venture holds nine planning consents and is waiting on decisions for three more. Construction is due to begin next year on at least five sites with 66 bays between them, taking the network to eight sites and 122 bays:
- Hounslow East: 8 bays in the station car park.
- Hillingdon: 12 bays in the station car park.
- Redbridge: 12 bays in the station car park, just off the A406.
- Dagenham Dock: 16 bays and a retail unit.
- West Barking: 18 bays and a retail unit.
Hanger Lane, London’s largest
Work is under way at Hanger Lane, on unused land in the Park Royal industrial estate. TfL says it will be London’s largest ultra-rapid EV charging destination when it opens in spring 2027, with 36 bays under yellow solar canopies, a retail space, toilets and outdoor seating, near the A40 Western Avenue and the A406 North Circular Road. Fully electric cement mixers are being used on site, and the plans include better walking and cycling access and new landscaping.

John Colgan, Electric Vehicle Charging Hubs Programme Manager at Places for London, said: “Seeing our joint venture with Fastned move at such a pace is hugely exciting. By unlocking TfL’s estate, we are transforming accessible land into critical, sustainable infrastructure where the capital needs it most.
“Every new bay we deliver helps decarbonise our transport network, supports local air quality, and generates revenue to be reinvested directly back into London’s transport system.”
London’s charging network in figures
- More than 29,500 public charging devices, around a third of the UK total, including more than 2,000 rapid or ultra-rapid devices.
- Between 860,000 and 1,049,000 electric vehicles projected on London’s roads by 2030, 29 to 36 per cent of the car and van fleet.
- Around 43,000 to 51,000 more charge points expected to be needed to meet that demand, several thousand of them 50kW or above.
- TfL estimates that the growth in electric vehicles, with the charging to support it, could cut London’s annual carbon emissions by between 1.5 million and 2.6 million tonnes by 2030.
Places for London’s latest report on what it says it adds to the capital is covered in our earlier story.
Source: Transport for London press office.
Have your say